|
This page displays reports of the latest travel conditions on public transport services and across the regions roads. |
| TRAFFIC & TRAVEL FOR THE SOUTHAMPTON AREA | |
|
GENERAL INFORMATION
|
. FINAL UPDATE ============ . URBAN ROUTES ============= . High Rd / Woodmill Lane jct; Emergency gas repair to start 1000hrs Monday 30th January with 4 way signals. Delay possible. These works are expected to last until Monday 6th February. . A33 Millbrook Road West; Lane closure inbound on Millbrook Road West between its jct with Regents Park Road and its jct with Paynes Road until the 8th February 2012 to allow a gas connection to be made. Delay at peak times. . All other routes are flowing freely. . See separate report for roadworks. . MOTORWAY & TRUNK ROADS ======================== . M3; Flowing freely. . M27; Roadworks with 50mph speed limit between jcts 2 and 3 both directions. . M271; Flowing freely. . PUBLIC TRANSPORT ================= . South West Trains. As a result of an earlier severe gas leak in the Fratton area services have been disrupted but will be returning to normal as from Mid-day today, Sat. 4th Feb. although some delays may still occur for the next few hours. For more information visit www.southwesttrains.co.uk. . |
|
Received from Southampton
ROMANSE at: 16:49:59
on: 04/02/12 Ref: 1315238064 / 2294 Expires:16:49:27 on: 11/02/12 |
| ROADWORKS IN THE SOUTHAMPTON AREA | |
|
GENERAL INFORMATION
|
. BURGOYNE ROAD (Start date: 13/02/12) (End date: 24/02/12) . Temporary traffic signals in operation 24hrs a day on Burgoyne Road at its jct with Tunstall Road from the 13th February 2012 to the 24th February 2012 to allow gas main replacement works to take place. . ARCHERS ROAD (Start date: 20/02/12) (End date: 22/02/12) . Temporary traffic signals in operation 24hrs a day on Archers Road at its jct with Carlton Road from the 20th February 2012 to the 22nd February 2012 to allow communication cable works to take place. . VICTORIA ROAD (Start date: 08/02/12) (End date: 17/02/12) . Temporary traffic signals in operation 24hrs a day on Victoria Road at its jct with Obelisk Road from the 8th February 2012 to the 17th February 2012 to allow a new water main to be laid. . ITCHEN BRIDGE (Start date: 06/02/12) (End date: 09/02/12) . Road works on the western side of the bridge with localised narrowing on the inbound carriageway (Southern footway) for 2 days from the 6th February 2012 to allow construction of pedestrian tactile crossing points. The outbound side (Northern footway) will commence on the 8th February 2012 for 2 days and will involve Stop/Go boards between 09:30hrs and 15:30hrs. . REDBRIDGE RDBT (Start date: 07/02/12) (End date: 15/02/12) . Urgent highway repairs are being carried out overnight on Redbridge Rdbt between 2100 hrs and 0600 hrs from 7th February 2012 to 15th February 2012. This will involve road closures at the Rdbt. Diversions will be in place. . PAIGNTON ROAD (Start date: 12/03/12) (End date: 30/03/12) . Paignton Road will be closed from its jct with Harlyn Road to a point 20m south on its jct with Harlyn Road for 3 weeks from the 12th March 2012 to allow the construction of a new kerb and footway scheme. . MILLBROOK ROAD WEST (Start date: 30/01/12) (End date: 08/02/12) . Lane closure inbound on Millbrook Road West between its jct with Regents Park Road and its jct with Paynes Road until the 8th February 2012 to allow a gas connection to be made. . MEGGESSON AVENUE (Start date: 11/02/12) (End date: 15/02/12) . Temporary traffic signals in operation 24hrs a day on Meggesson Avenue at its jct with Benhams Road from the 11th February 2012 to the 15th February 2012 to allow a new water main to be laid. . MEGGESSON AVENUE (Start date: 15/02/12) (End date: 19/02/12) . Temporary traffic signals in operation 24hrs a day on Meggesson Avenue at its jct with Hallet Close from the 15th February 2012 to the 19th February 2012 to allow a new water main to be laid. . LORDS HILL WAY (Start date: 31/01/12) (End date: 20/02/12) . Temporary traffic signals in operation between 09:30hrs and 15:30hrs on Lord's Hill Way near its jct with Lord's Hill Centre East from the 31st January 2012 to the 2nd February 2012 to allow installation of a communications tower. . Temporary traffic signals will again be in operation between 09:30hrs and 15:30hrs on the 20th February 2012 for further installation works. . WARBURTON ROAD (Start date: 30/01/12) (End date: 13/02/12) . Temporary traffic signals in operation 24hrs a day on Warburton Road at its jct with Burgoyne Road from the 30th January 2012 to the 13th February 2012 to allow gas main replacement works to take place. . GREEN LANE (Start date: 13/02/12) (End date: 19/02/12) . Green Lane will be closed between its jct with Romsey Road and its jct with Buttermere Close for 1 week from the 13th February 2012 to allow resurfacing works to take place. . SOMERSET AVENUE (Start date: 13/02/12) (End date: 19/02/12) . Closed from the 13th February 2012 to the 19th February 2012 between its jct with Bitterne Road East and its jct with Sunningdale Gardens to allow gas main replacement works. . BITTERNE ROAD EAST (Start date: 13/02/12) (End date: 19/02/12) . Temporary traffic signals in operation 24 hrs a day from the 13th February 2012 to the 19th February 2012 at the jct with Somerset to allow gas main replacement works. . BULLAR ROAD (Start date: 06/02/12) (End date: 07/03/12) . Temporary traffic signals in operation 24hrs a day on Bullar Road from the 6th February 2012 to the 7th March 2012 to allow kerbing and footway reconstruction to take place. . BRIDGE ROAD (Start date: 06/02/12) (End date: 10/02/12) . Temporary traffic signals in operation between 09:30hrs and 16:30hrs on Bridge Road near its jct with Oakbank Road from the 6th February 2012 to the 10th February 2012 to allow coring and survey of the rail bridge. . HELVELLYN ROAD (Start date: 01/01/12) (End date: 31/03/12) . Helvellyn Road will be closed between the entrance to Mason Moore Primary School and its junction with the eastern end of the service road from 1st January 2012 to 31st March 2012 to allow redevelopment works to take place. . HAVELOCK ROAD (Start date: 09/01/12) (End date: 06/04/12) . The following turning restrictions will be in place from 9th January 2012 to 6th April 2012 to allow highway improvements to be carried out: No right turn from West Park Road into Havelock Road; and Ahead only from Commercial Road at the junction with Havelock Road. . There will also be various lane closures on Havelock Road at its jct with Commercial Road while these works take place. . KENDAL AVENUE (Start date: 13/12/11) (End date: 10/02/12) . Temporary traffic signals in operation 24hrs a day on Kendal Avenue at its jct with Cuckmere Lane from the 13th December 2011 to the 10th February 2012 to allow gas main replacement works to take place. . OXFORD STREET (Start date: 23/01/12) (End date: 02/03/12) . Oxford Road will be closed from a point 10m east of its jct with John Street to a point 15m west of its jct with John Street for 6 weeks from the 23rd January 2012 to allow highway improvement works to take place. . WIMPSON LANE (Start date: 06/09/11) (End date: 10/02/12) . Wimpson Lane is closed in both directions from its jct with Romsey Road to its jct with Maybush Road until the 10th February 2012 to allow highway alterations and re-development works to be carried out. . ROMSEY ROAD (Start date: 10/02/12) (End date: 30/04/12) . *** UPDATE *** Temporary traffic signals in operation 24hrs a day on Romsey Road at its jct with Rownhams Road and Wimpson Lane from the 10th February 2012 to the 30th April 2012 to allow highway construction and drainage works to take place. . GOLDEN GROVE (Start date: 27/06/11) (End date: 30/03/12) . Temporary traffic signals in operation 24hrs a day on Golden Grove at its jct with Clifford Street from the 27th June 2011 to the 30th March 2012 to allow for an un-loading area for the development site. . |
|
Received from Southampton
ROMANSE at: 08:58:37
on: 04/02/12 Ref: 1300173451 / 625 Expires:08:58:05 on: 11/02/12 |
| TRAFFIC & TRAVEL INFORMATION FOR HAMPSHIRE | |
|
GENERAL INFORMATION
|
. You can now follow us on Twitter at www.twitter.com/ROMANSE . MOTORWAYS & TRUNK ROADS ========================= . M3 - Free flowing. . M27 - Accident westbound just after J9 cleared, all lanes open. Long delays remains in both directions. . M275 - Free flowing. . A3(M) - Free flowing. . A3 - Free flowing. . A27 Portsmouth - Free flowing. . A31 New Forest - Free flowing. . A34 - Free flowing. . A303 - Free flowing. . OTHER AREAS ============ . No reported incidents. . PUBLIC TRANSPORT ================= . No reported incidents. . |
|
Received from Hampshire
ROMANSE at: 18:58:46
on: 03/02/12 Ref: 2099625960 / 470 Expires:18:58:33 on: 10/02/12 |
| ROADWORKS INFORMATION FOR HAMPSHIRE | |
|
GENERAL INFORMATION
|
. You can now follow us on Twitter at www.twitter.com/ROMANSE . A3 LONDON ROAD, PURBROOK . Temporary 24hr two-way traffic signals in operation between its junctions with Ladybridge Road and Campbell Crescent to allow for gas main works. PERIOD OF OPERATION: 17th January 2012 - TBC. . A3090 WINCHESTER HILL, ROMSEY . Temporary 24hr two-way traffic signals in operation between its junctions with Cupernham Lane and Viney Avenue to allow for gas main works. PERIOD OF OPERATION: 20th January 2012 - 17th May 2012. . B2149 DURRANTS ROAD, ROWLANDS CASTLE . Temporary road closure from its junction with B2148 Whichers Gate Road to a point 500m south thereof to allow for highway works. ALTERNATIVE ROUTE: B2148 Whichers Gate Road/Comley Hill, Bartons Road and B2149 Petersfield Road. PERIOD OF CLOSURE: 7th September 2011 - 2nd March 2011. . B3006 STATION ROAD, LISS . Temporary road closure between its junction with B3006 Hill Brow Road to a point 111m northwest thereof to allow for drainage connection works. ALTERNATIVE ROUTE: B3006 Hill Brow Road, Andlers Ash Road, Flexcombe Link Overpass, A3 and Farnham Road. PERIOD OF CLOSURE: 30th January 2012 - 7th February 2012. . B3084 STANBRIDGE LANE, ROMSEY . Temporary road closure from its junction with Old Salisbury Road to a point 150m east thereof to allow for works to replace the railway bridge. ALTERNATIVE ROUTE: A3057 Greatbridge Road, A3057 Stockbridge Road, Kimbridge Lane and B3084 Dunbridge Lane. PERIOD OF CLOSURE: 5th December 2011 - 6th April 2012. . B3335 ALLBROOK HILL, EASTLEIGH . Temporary road closure between its junction with Pitmore Road to the east side of the railway bridge to allow for the replacement of asign on the railway bridge. PERIOD OF CLOSURE: 1st February 2012. . B3335 ST CROSS ROAD, WINCHESTER . Temporary 24hr three-way traffic signals in operation at its junction with Garnier Road to allow SGN to carry out urgent works to repair a gas leak. PERIOD OF OPERATION: 30th January 2012 - TBC. . B3402 WEYHILL ROAD, ANDOVER . Temporary road closure between its junctions with The Drove and Colebrook Way to allow for works to replace the railway bridge. PERIOD OF CLOSURE: 24th December 2011 - 23rd March 2012. . CHERBOURG ROAD, EASTLEIGH . Temporary road closure between its junctions with Desborough Road and High Street to allow for maintenance works. ALTERNATIVE ROUTE: Desborough Road, Chestnut Avenue and High Street. PERIOD OF CLOSURE: 1st February 2012. . HOBB LANE, HEDGE END . Temporary road closure between its junctions with Sherborne Way and B3033 Lower Northam Road to allow for gas works. PERIOD OF CLOSURE: 5th September 2011 - 2nd March 2012. . HUSSELL LANE, MEDSTEAD . Temporary road closure to allow for drainage works as part of Operation Resilience. PERIOD OF CLOSURE: 13th December 2011 - 3rd February 2012. . MARKET SQUARE, PETERSFIELD . Temporary road closure between its junctions with High Street and Sheep Street to allow Scottish and Southern Energy to carry out excavation works to replace existing network. PERIOD OF CLOSURE: 15th January 2012 - 6th February 2012. . MILTON ROAD, COWPLAIN . Temporary 24hr four-way traffic signals in operation at its junction with Woodcroft Lane/Lovedean Lane to allow for gas works. PERIOD OF OPERATION: 11th April 2011 - 30th March 2012. . ST PETERS ROAD, PETERSFIELD . Temporary road closure between its junction with Market Square and a point 20m south east thereof to allow Scottish and Southern Energy to carry out excavation works to replace existing network. PERIOD OF CLOSURE: 15th January 2012 - 6th February 2012. . |
|
Received from Hampshire
ROMANSE at: 16:13:28
on: 01/02/12 Ref: 2099625878 / 250 Expires:16:13:17 on: 08/02/12 |
Click here to refresh the page and ensure the latest real time information is shown.
If further advice is required on the latest train running information, please call National Rail Enquiries on 08457 48 49 50
(24 hours. Calls are charged at local rate and may be recorded)